Product parameter
Material | zinc alloy |
color | Chrome |
Surface treatment | electroplating |
Product application | bathroom |
Weight | 1678g |
Using die-casting machine | |
Quality | high grade |
Casting process | high pressure die casting |
Drawing format | |
Secondary processing | machining/polishing/plating |
Main features | bright/corrosion resistant |
Certification | |
Test | Salt Spray/Quench |
Our advantage
1. In-house mold design and manufacturing
2. Possess mold, die-casting, machining, polishing and electroplating workshops
3. Advanced equipment and excellent R&D team
4. Various ODM+OEM product range
Supply Ability: 10,000 pieces per month
Production process: drawing → mold → die casting-deburring → drilling → tapping → CNC machining → quality inspection → polishing → surface treatment → assembly → quality inspection → packaging
Application: bathroom accessories
Packing and shipping
Packing details Bubble bag + export carton
Port: FOB Port Ningbo
Lead time
Quantity (number of pieces) | 1-100 | 101-1000 | 1001-10000 | >10000 |
Time (days) | 20 | 20 | 30 | 45 |
Payment and transportation: prepaid TT, T/T, L/C
competitive advantage
- Accept small orders
- fair price
- Deliver on time
- Timely service
- We have more than 11 years of professional experience. As a manufacturer of bathroom accessories, we take quality, delivery time, cost, and risk as our core competitiveness, and all production lines can be effectively controlled
- The products we make can be your sample or your design
- We have a strong research and development team to solve the problem of bathroom hardware
- There are many supporting manufacturers around our factory
Good Quality Comes From The Relentless Pursuit Of Detail
Focus on 304 health quality Quality manufacturers, OEM OEM/OEM,
welcome friends from all walks of life to come to consult and cooperate
R&D Flow
The process from the beginning to the formation of a product.
I. Determine product
2. Sign NDA
3. R&D team evaluation
4. R&D Manager will give suggestion
5. Sale offer quotation
6. Start to open new mold and offer samples
7. R&D improved prototype until customersconfirm
8. Customer offer prototype feedback
9. Offer prototype and 3D mold
10. Customer confirmed Quotation
11. Customers feedback samples
12. Improved mold & offer new samples
13. Customers confirm final samples
14. Production arranged first batch to test
one month in our test room
15. After test passed, enter mass production